Project Experience - Waste Water Plants

Biosolids Improvements

CLIENT: City Of Houston, Texas

CONTRACT TYPE: Sub-Contract To CH2M Hill, Inc.

PROJECT DESCRIPTION: Improvements to Sludge Handling Facilities at Greenridge, Chocolate Bayou, Northgate, Intercontinental Airport and Beltway Wastewater Treatment Plants.

YEAR COMPLETED: 2002

CONSTRUCTION COST: $3.0 million (Estimated KGI's Portion of the Project).
Total project cost is estimated at $3.91 million.

SCOPE OF WORK: KGI was responsible for preparing preliminary engineering, final design, and construction drawings and technical specifications for Greenridge, Chocolate Bayou and Northgate wastewater treatment plants. KGI's scope included process, mechanical, electrical and instrumentation. Civil and Structural portions of the project were performed by Others.

Some of the major improvements included:

  • New 70 ft. diameter Thickener.
  • Modifications to existing Aerobic Digesters including Diffused Aeration System.
  • Thickened Sludge Transfer Pumps.
  • Belt Filter Press Feed Pumps.
  • Dewatered Sludge Pumps at Chocolate Bayou and Northgate WWTPs.
  • Belt Conveyance System at Greenridge WWTP.
  • Polymer Systems.
  • Electrical, Instrumentation and Controls at all of the plants

   