Expansion of Bio-Energy Recovery System

CLIENT: Anheuser Busch, Inc.

CONTRACT TYPE: Sub-Contract to J.F. Thompson, Inc

PROJECT DESCRIPTION: Provide engineering services to upgrade the existing
Bio-Energy Recovery System.

YEAR COMPLETED: 2001

CONSTRUCTION COST: $1.0 million (KGI's portion of work)

SCOPE OF WORK: KGI was responsible for preparing P&IDs, equipment data sheets, piping plans, and piping isometric drawings with material take-offs. KGI was also responsible for performing all calculations for sizing piping, pumps and other equipment.

The project included the following equipment:

  • New 900 scfm Bio-Gas Compressor Skid.
  • New 570 scfm Bio-Gas Dryer Skid.
  • Two new Off-Gas Fans and Carbon Filters
  • Bio-Mass Load-Out Station.
  • Two new 2,500 scfm Sulfide Oxidation Blowers
  • Cooling Towers Overflow and Chemical Feed System
  • New 3,300 gpm Jet Mixer Pumps.
  • New Mg(OH)2 Tank Mixer and Platforms.
  • Four new Reactor Feed Pumps.
  • New Water Reclaim System.