CLIENT: City of Houston, Texas

CONTRACT TYPE: Sub-Contract to CDM, Inc.

PROJECT DESCRIPTION: The project included construction of a new influent flow control station, piping, a new water storage tank (8.9 MG), cathodic protection, new pump building with two horizontal split case centrifugal pumps, One Ton Chlorine Storage and Feed Building, Ammonia Storage and Feed Building, Diesel Standby Generator Building, new MCC and SCADA system.

YEAR COMPLETED: 2002

CONSTRUCTION COST: $2.0 million (KGI's portion of work).

SCOPE OF WORK: KGI was responsible for preparing preliminary engineering, final design, and construction drawings and technical specifications for all of the electrical, HVAC and plumbing systems involved on the project.

Some of the major improvements included:

  • New 4,160 volt Switchgear
  • Two 480 volt MCCs
  • Power and Controls for two pump motors (300 HP and 500 HP) and three
    500 HP future pumps.
  • Power and Controls for the Chemical Buildings and Flow Control Station.
  • Power and Controls for the Standby Generator
  • SCADA
  • HVAC and pluming for the Buildings

 