Storm Water Management Model
CLIENT:
Chevron Cedar Bayou Plant
CONTRACT
TYPE: Prime Contractor
PROJECT
DESCRIPTION: Hydraulic Evaluation of existing storm
water system
YEAR
COMPLETED: 2002
CONSTRUCTION
COST: N/A (Study)
SCOPE
OF WORK: KGI was responsible for preparing a comprehensive
Storm Water Management Plan for the entire Chevron Cedar
Bayou plant. The project included developing a hydraulic
model of the existing potentially Contaminated Storm
Water (CSW) system. The model was used as a tool to
determine the hydraulic capacity of the existing CSW
system, identify bottlenecks and propose improvements.
In addition, the model was used to study the effect
of future expansions on the CSW system and the wastewater
treatment facilities. The project duration was approximately
12 months.
|